VFR-AK AK-47 Handguard Installation Instructions Gas Tube and Handguard removal Rotate the Gas Tube Retaining Lever upward until the Gas Tube can be p
Tорцевой ключ 3 мм - 2 - Fig. 5 Fig. 6 Handguard Locking Lever 3 mm Alen Wrench 2.5 mm Alen Wrench VFR-AK Handguard Installation Release the Handgua
Front Retainer Step 4. • Place the Front Retainer on the Lower Handguard. • Lock the Lower Handguard by turning thе Locking Lever 180 degrees (Fig. 9
- 4 - 11Fig. 10Fig. •Step 4. Place the Gas Tube on the receiver. Lock the Gas Tube by turning the Locking Lever downward (Fig. 10). Step 5. Lift R
12Fig. - 5 - 13Fig. 43, Yakov Olamy St. Mishmar Hashiva ISRAEL 50297 Tel: +972 3 960 3399 Fax: +972 3 960 3312 defense.com-www.fabWebsite: Step 6.
Kommentare zu diesen Handbüchern